Scroll Top

News

Aug. 11 (8/11) a reminder to always call 811 before digging

Aug. 11, 2016 – With August 11 almost here, Cascade Natural Gas hopes this date on the calendar, 8/11, will serve as a natural reminder for residents to call 811 prior to any digging project to have underground utility lines marked. Every six minutes an underground utility line is damaged nationwide because someone decided to dig without first calling 811.

When calling 811, homeowners and contractors are connected to the local one call center, which notifies the appropriate utility companies of their intent to dig. Professional locators are then sent to the requested digging site to mark the approximate locations of underground lines with flags, spray paint or both. This is a free service.

Striking a single line can cause injury, repair costs, fines and inconvenient outages. Every digging project, no matter how large or small, warrants a call to 811. Installing a mailbox, building a deck, planting a tree and laying a patio are all examples of digging projects that need a call to 811 before starting. After all, calling before you dig is the law.

“On Aug. 11 and throughout the year, we remind homeowners and professional contractors alike to call 811 before digging to eliminate the risk of striking an underground utility line,” said Eric Martuscelli, vice president of operations at Cascade Natural Gas. “It really is the only way to know which utilities are buried in your area.”

The depth of utility lines can vary for a number of reasons, such as erosion, previous digging projects and uneven surfaces. Visit www.call811.com for more information about safe digging practices.

FOR CUSTOMER SERVICE:

Call 888-522-1130

FOR MEDIA INQUIRIES:

Call 701-530-1093 between 8 a.m. and 5 p.m. CT Monday through Friday.

Email: [email protected]

SOCIAL MEDIA: